Project news

 

 

01/06/2016

 Project start


 

08 – 11/2016

Acceptation of engine installations, readiness for testing of propellers confirmed.

 

SMA SR305 & WOODCOMP KW-15 ready do start testing.

 

 

04/10/2016

ARGOS presentation on the National Information Day “Horizon 2020 - smart, green and integrated transport 2017”, organized by Technology Centre of the Czech Academy of Sciences, Prague, 04/10/2016.

 

 



2/2017

First part of strain – gauge measurements & evaluation was accomplished and data analysed

     
 

 


 

17/02/2017

 ARGOS presentation on the “Clean Sky 2 Conference”, organized Ministry of Industry and Trade and by Technology Centre of the Czech Academy of Sciences, Prague, 17/02/2017.

 

 

02/2017

Tests of a new propeller governor were started.

 

Jihostroj PCU installed on the engine.

 


 

05/2017

06/2017

Presentation of ARGOS:

  • AERO Friedrichshafen (05 – 08/04/2017)
  • Paris Air show (19 – 23/06/2017)

 

Jihostroj was present on both exibitions. The company presentaion included alsou onformation about H2020/CS2 resaerch projects.

 


 

06/2017

Work Package 1 was finished by Milestone 1 "Acceptance of achivments". The work now continues with Work Package 2 and it is aimed at the design of new propeller and governor.

 

WP2 contains both, theoretical analysis and experimental feedback.

 


 

03/2018

Work Package 2 was finished by Milestone 2 "Acceptance of design". The work now continues with Work Package 3 aimed at production of prototypes.


 


The prototype production was prepared in WP2.

 


 

04/2018

 

ARGOS was presented on AERO Friedrichshafen 2018

 


 

15/08/2018

First run of the ARGOS propeller & governor was done on 15/08/2018.


 

 


 

08/2018

 

WP3 was accomplished. The prototype propeller and governor are ready for engine tests in WP4.

 


 

01/2019

 Propeller instrumentation

The propeller was instrumented for s-g measurements and tests are going on.

 



 

04/2019

 AERO 2019

ARGOS presentation on AERO 2019, Friedrichshafen (prototype no. 3)

 




 

05/2019

 WP4 Finished

WP4 aimed at s-g measurements of prototype propeller was finished.

 





 

06/2019

 LeB 2019

ARGOS presentation Le Bourget 2019

 




 

08/2019

 Endurance test

Endurance test of the propeller was started (prototype no. 4)

 




 